EPG has established up a comprehensive set of top quality management technique which is supplied with superior inspection and test equipment.
Components |
1. metal:Aluminum/Steel/Alloy steel/Stainless steel/Brass,copper,bronze and so forth. 2. plastic: Stomach muscles,POM,PE,PP,PVC,Computer,PMMA,Teflon,nylon and many others. 3. others: carbon fiber, glass,fiberglass, wooden, tough rubber etc. |
Shade |
Silver, Gray, Black ,Gold or as client’s necessity |
Surface Roughness |
Ra0.8 ( without polishing or grinding) |
Emblem Technique |
laser engraving, CNC engraving, display-printing etc. |
Floor Finish |
Anodize polishing zinc/nickel/chrome/gold plating, sand blasting, ect. |
Tolerance |
+/- .01–.05mm / can also be tailored |
Certificate |
ISO SEPG |
Processing equipments |
CNC machining center,NC lathe, Grinding machine, Computerized lathe equipment, Conventional lathe equipment,Milling equipment,Drilling machine,EDM,Wire-reducing equipment,CNC bending machine and many others |
Screening equipment |
Coordinate measuring device,Image measuring instrument,Caliper and many others |
Software |
Medical Devices/Digital/ Industrial// Automation / motorcycle/3D printer |
Services |
OEM,ODM or as client’s necessity |
Packaging & Delivery
Packaging Information
1. interior packaging: plastic wrap, bubble bag, PE foam, EPE cotton,PP bag etc.
2. outer packaging: carton box, wooden case, plate etc.
3. as for each customers’ requirement
Port
xiamen, or as client’s need
Direct Time :
Quantity(Parts) | 1 – 20 | 21 – 100 | 101 – 1000 | >1000 |
Est. Time(days) | 5 | ten | 25 | To be negotiated |
Trade Terms | FOB, CIF, EXW |
MOQ | 1Pcs |
Port | xiamen, or as client’s prerequisite |
Delivery | By air (DHL,UPS,Fedex,EMS and many others.),By Sea,Specific… |
Payment Technique | T/T(financial institution transfer),L/C,paypal,western union, moneygram,escrow, income and many others |
Payment Conditions | fifty% just before production, fifty% prior to shipping |
Packing | interior box,numerous boxes/grasp carton or as customer’s prerequisite |
Supply time | 5-7days for Alanple time,5-25 days for production |
If you will find something I can help, remember to really feel free of charge to contact with me
Telephone: 18060902874